Campus Building Topped Out at Long Beach State
- Share via
Completion is scheduled next February for the $11.1-million Engineering/Computer Science Building that was topped out earlier this month at Cal State Long Beach.
The 100,000-square-foot, six-story building was designed by the Luckman Partnership Inc. to accommodate offices and laboratories with such exotic equipment as a 75-foot-long wind tunnel, a 75-foot oceanography tank with a wave machine, four 20-foot-high petroleum cracking towers and three main-frame computer rooms.
The building is being constructed on a one-acre site in the western part of the 322-acre campus. The general contractor is Berry Construction Inc., Upland.
More to Read
Sign up for Essential California
The most important California stories and recommendations in your inbox every morning.
You may occasionally receive promotional content from the Los Angeles Times.